Drywall, Joint Compound and Plaster Removal in Buena Park

Typical cost in Buena Park

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+

Wall and ceiling finishes can contain asbestos, and the South Coast Air Quality Management District’s survey reaches the material inside wall and ceiling cavities where that is needed to sample it. Samples come before anything is cut open.

A positive result means plastic sheeting goes up with air filters running, and the affected wall or ceiling material comes out and is bagged. Rebuilding the wall and painting it are not part of that.

Request a free quote
Close view of textured tan stucco with a small gray patched area and hairline cracks.

Wall and ceiling materials

Plaster walls

Plaster that is coming off needs a sample before the crew starts stripping it. The lab report says whether it contains asbestos and where on the wall it was taken.

Joint compound and drywall

The seams of a drywall wall hold joint compound, and that compound is its own sample. The drywall sheets and the compound can have different results.

A new doorway or one wall

A small opening and one wall can be a small job. Size decides which rules apply, and the lab results tell you how much material is involved.

Taking a wall out

A wall that holds up the structure is not a small job. Taking out any load-supporting member is demolition under the rule, which needs the survey and the district notice.

Rules for wall work

Wall work comes down to the survey, the notice and who is on the crew, and the next three entries take them in that order.

Survey first

Opening a wall without a survey is not how this rule works. The sampling reaches the surfaces and the inside of a wall or ceiling cavity where needed, and a Cal/OSHA-certified asbestos consultant or technician does it before demolition or renovation, apart from a small single-unit house renovation.

Notice

The district notice goes in no later than 10 working days before the work. A renovation removing less than 100 square feet of asbestos-containing material does not need it, in any type of building, but demolition always does.

Larger jobs

Credentials start to matter at 100 square feet or more of asbestos-containing material. Cal/OSHA wants the employer registered, and the Contractors State License Board wants the contractor to hold the C-22 Asbestos Abatement classification, or the license’s qualifier to have passed the asbestos certification exam.

Empty room with clear plastic sheeting over the walls and windows, a plank floor and a blue-gray portable air machine with a hose.

Wall samples follow asbestos testing. Other materials are on our main page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 255-6750

Call (657) 255-6750