Asbestos Removal in Fullerton

We handle asbestos testing and removal for Fullerton homeowners and property managers. A project here starts the same way as anywhere in the district, with a survey prior to any demolition or renovation.

Remodeling here begins with finding out what is in the house, since half of Fullerton’s homes were built in or before 1969 and more than 7 in every 10 before 1980.

Request a free quote
Entry with a patterned vinyl floor, a paneled front door, a bathroom visible through an open door and plastic sheeting hanging along the left wall.

How we can help

Testing first

Every Fullerton job begins with asbestos testing. A consultant or technician with the right certification gathers the samples, the lab analyzes each one, and the removal plan is drawn up only after the report arrives.

Ceilings

A textured ceiling gets a sample before popcorn ceiling removal begins, and the texture comes off only if the result says to.

Floors

Each layer of flooring gets sampled for floor tile and mastic removal, from the tile or sheet vinyl on top to the adhesive beneath it and down to the joists.

Remodels and teardowns

We pull out the materials that tested positive before the remodelers or the demolition crew arrive. Demolition jobs also need the district notice, and both are covered under renovation and demolition abatement.

Fullerton housing

Fullerton’s housing leans old, with 71.3 percent of homes built before 1980 and 8.9 percent before 1950, so a survey ahead of a remodel is a sensible first step.

Owners and renters

Fullerton is 48.2 percent renters and 60.4 percent one-unit homes. Under Rule 1403, a rental house or an apartment building is a residential structure just as an owner-occupied house is.

Larger buildings

Fullerton has 29.5 percent of its homes in buildings with five or more units. Those buildings are covered by Rule 1403 like any residential structure, and its single-unit carve-outs were not written for them.

Rules for your project

Fullerton work runs under South Coast Air Quality Management District Rule 1403. A survey has to happen prior to any demolition or renovation, and the district must get its notice no later than 10 working days before the work.

Who files

The abatement contractor submits the notice online with the district notification fee. A renovation removing less than 100 square feet of asbestos-containing material does not need it, in any type of building, and demolition does.

Confirm for your address

A question about how a rule fits your address goes to the district’s asbestos hot line, (909) 396-2336.

Bathroom with the wall around the tub opened to the framing, teal and pink wall tile at the right and plastic sheeting hanging at the left.

Frequently asked questions

Do I need testing before a Fullerton remodel?

Testing is the first step, since the survey rule applies before demolition or renovation whatever the age of the house. A carve-out for renovation of a residential single-unit dwelling removing less than 100 square feet of asbestos-containing material exists, but it leaves out demolition, condominiums, townhouses and apartments.

Who files the district notice?

It goes in through the district’s online Rule 1403 web application, filed by the abatement contractor. On the work we do, we file it, and the notification fee goes in with it.

Does a condo get the same rules?

Condominiums are covered by the rule, and they do not qualify for the single-unit carve-outs. Apartment buildings and townhouses are in the same position.

Who tests the air afterward?

An independent consultant. State law bars removal contractors from performing clearance air monitoring.

See asbestos removal in La Habra, or return to our main page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 255-6750

Call (657) 255-6750