Example Asbestos Removal Projects in Buena Park

The seven example jobs below are set in Buena Park, La Habra and Fullerton. Each one lists what was sampled, what came out, the work days and an estimated cost.

Popcorn texture removed from a family room before recessed lights go in

Example project

Home
1960s ranch house in Buena Park with a popcorn ceiling in the family room
Original request
Install recessed can lights across the family room ceiling
Testing
A Cal/OSHA-certified asbestos consultant samples the popcorn texture at three spots
Found
Asbestos in the popcorn texture
Area
About 260 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$2,700

Scope of work

Three samples, the district notice, the room sealed with air filters running, the texture soaked and scraped into bags, a HEPA clean and the haul. The clearance air test, the can lights and the new ceiling finish are separate.

Project overview

In this example, the owners of a 1960s ranch house in Buena Park want recessed lights in the family room. Each light means a hole cut through the popcorn texture, so the ceiling is sampled before the electrician is booked.

The texture tests positive at all three spots. The abatement crew removes it from the whole ceiling, and the electrician and drywall finisher work on a bare surface.

The goal

The goal is a bare ceiling, so the can lights are cut into drywall that holds nothing positive.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling in three places.
  2. Before work The abatement contractor files the district notice online and the owners empty the room.
  3. Day one The room is sealed, and the texture is soaked and scraped into bags.
  4. Day two The ceiling is wiped down, the bags leave and an independent consultant tests the air.

Planning right

  • Move the TV wall and the furniture out of the room.
  • Draw the can light layout for the electrician in advance.
  • Book the electrician for after the air results.
  • Keep the lab report with the house papers.

Get a free quoteMore about popcorn ceiling removal

Ceiling and kitchen floor materials removed before a whole-house remodel

Example project

Home
1960s single-story house in La Habra, with textured ceilings throughout and sheet vinyl in the kitchen
Original request
Remodel the whole house, with new ceilings, a new kitchen floor and new lighting
Testing
A whole-house survey by a Cal/OSHA-certified asbestos consultant, about 12 samples
Found
Asbestos in the ceiling texture in every room and in the kitchen vinyl backing
Clear
The wall compound
Area
About 1,150 sq ft of ceiling and 220 sq ft of kitchen floor
Timeline
Notice no later than 10 working days ahead, then five working days
Cost
$16,800

Scope of work

Removal of the ceiling texture and the kitchen vinyl, the district notice, rooms sealed in turn, bagging and the haul with its paperwork. The survey, the clearance air test, the city paperwork and the remodel itself are separate.

Project overview

In this example, a family is remodeling a 1960s house in La Habra. The city’s Building and Safety counter has an Asbestos Declaration for Demolition and Renovation, where the applicant states whether the job involves asbestos.

The survey finds positive ceiling texture and kitchen vinyl, so the declaration says asbestos is involved and the district notice goes in at least 10 working days ahead. The abatement crew clears the house before the remodel crew starts.

The goal

The goal is a house with the positive ceiling and floor material gone, so the remodel starts on clean surfaces.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room and the kitchen floor.
  2. Before work The contractor files the district notice online, and the owners sign the city declaration with the permit.
  3. Days one to five Room by room the ceiling texture comes down wet, then the kitchen vinyl is lifted and bagged.
  4. Last An independent consultant tests the air, and the remodel crew starts.

Planning right

  • Ask the counter for the declaration form before the permit visit.
  • Move out of the rooms being worked on, or out of the house.
  • Keep the survey, the notice and the manifest in one folder.
  • Book the remodel crew for after the air results.

Get a free quoteMore about renovation and demolition abatement

Floor tile removed from an upstairs and a downstairs bathroom plus the laundry

Example project

Home
1970s two-story house in Fullerton with a bathroom upstairs, a bathroom downstairs and a laundry nook beside the lower one
Original request
Replace the floors in both bathrooms and the laundry with matching new tile
Testing
A Cal/OSHA-certified asbestos consultant samples the tile and the mastic in each room
Found
Asbestos in the mastic under both bathroom floors
Clear
The laundry flooring and the tile itself
Area
About 200 sq ft of floor across the three rooms
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$2,900

Scope of work

Samples from each room, the district notice, each room sealed in turn, the tile lifted and the positive mastic removed wet, bagging and the haul. The clearance air test and the new tile are separate.

Project overview

In this example, the owners of a 1970s two-story house in Fullerton are replacing the floors in both bathrooms and the laundry nook. The old tile will come up in all three rooms.

The tile is clear but the mastic under both bathroom floors tests positive. The abatement crew works the downstairs rooms first and the upstairs bathroom next, so one room is always open for use.

The goal

The goal is bare subfloors in all three rooms, so the new tile is set on clean surfaces.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the tile and the mastic in all three rooms.
  2. Before work The contractor files the district notice online.
  3. Days one to three Each room is sealed in turn, the tile is lifted and the mastic comes off wet.
  4. Last An independent consultant tests the air, then the tile setter starts.

Planning right

  • Plan which bathroom stays usable on each day.
  • Keep the stairs clear for the crew’s bags.
  • Order the new tile after the air results.
  • Keep the lab report with the remodel papers.

Get a free quoteMore about floor tile and mastic removal

Sheet vinyl removed from under a kitchen peninsula that is coming out

Example project

Home
1960s house in Buena Park with a cabinet peninsula between the kitchen and the family room
Original request
Remove the peninsula and run one new floor through the kitchen
Testing
A Cal/OSHA-certified asbestos consultant samples the sheet vinyl, its felt backing and the mastic under the peninsula
Found
Asbestos in the vinyl backing and the mastic
Clear
The top layer of the vinyl
Area
About 130 sq ft of kitchen floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,300

Scope of work

Samples of each layer, the district notice, the kitchen sealed, the vinyl and its backing lifted and the mastic removed wet, bagging and the haul. The clearance air test, the cabinet work and the new floor are separate.

Project overview

In this example, the owners of a 1960s house in Buena Park are taking out the cabinet peninsula between the kitchen and the family room. The floor under the cabinets was never replaced, and the same vinyl runs under it.

The vinyl backing and the mastic test positive. The abatement crew removes them once the peninsula is out of the way, and the flooring installer lays one new floor across the whole room.

The goal

The goal is a single bare floor across the kitchen, so the new flooring has no old layers under any part of it.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the vinyl at the kitchen edge and under the peninsula.
  2. Before work The abatement contractor files the district notice online.
  3. Day one The cabinet crew takes out the peninsula, then the kitchen is sealed and the vinyl is lifted.
  4. Day two The mastic is removed wet and an independent consultant tests the air.

Planning right

  • Empty the cabinets in the peninsula before work.
  • Decide on the new floor before the removal is booked.
  • Keep the lab report with the cabinet drawings.
  • Plan a few meals that need no kitchen.

Get a free quoteMore about renovation and demolition abatement

Duct wrap removed where a new return vent is cut into a hallway wall

Example project

Home
1960s single-story house in Buena Park with a return duct running above the hallway ceiling
Original request
Add a return vent in the hall wall for a new air conditioner
Testing
A Cal/OSHA-certified asbestos consultant samples the wrap on the return duct and the joint tape
Found
Asbestos in the wrap on the return duct
Clear
The joint tape and the hall wall compound
Area
About 40 sq ft of duct wrap
Timeline
Less than 100 square feet of renovation, so no district notice, then one working day
Cost
$1,800

Scope of work

The hall sealed with plastic, the wrapped section of the return duct removed wet and bagged, a cleanup and the haul. The survey, the vent cut, the new duct work and the air conditioner are separate.

Project overview

In this example, the owner of a 1960s house in Buena Park is adding a return vent in the hallway wall for a new air conditioner. The cut opens the wall below an old return duct.

The wrap on that duct tests positive and the wall compound is clear. The abatement crew removes the wrapped section first, then the cooling crew cuts the wall and sets the vent.

The goal

The goal is a hall wall opened beside duct that is free of positive wrap.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap, the tape and the hall wall.
  2. Results The duct wrap is positive and the tape and wall are clear.
  3. Work day The hall is sealed and the wrapped section is wetted, cut out and bagged.
  4. Then The cooling crew cuts the wall and installs the return.

Planning right

  • Clear the hall of rugs and pictures.
  • Mark where the vent should go.
  • Ask the cooling crew to wait for the wrap to come out.
  • Keep the report with the air conditioner papers.

Get a free quoteMore about HVAC duct and pipe insulation removal

Garage wall and ceiling compound removed before a studio conversion

Example project

Home
1960s house in Buena Park with a two-car garage taped and textured as a finished space
Original request
Convert the garage into a studio with new insulation, wiring and drywall
Testing
A Cal/OSHA-certified asbestos consultant samples the joint compound and wall texture on the walls and the ceiling
Found
Asbestos in the joint compound on the walls
Clear
The ceiling texture
Area
About 430 sq ft of wall
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$4,900

Scope of work

Samples of the walls and ceiling, the district notice, the garage sealed with air filters running, the wall drywall and compound removed wet, bagging and the haul. The clearance air test, the wiring and the new walls are separate.

Project overview

In this example, a family in Buena Park is converting the two-car garage of a 1960s house into a studio. The old garage walls and ceiling were taped and textured, and the conversion strips them to the studs.

The wall compound tests positive and the ceiling texture is clear. The abatement crew removes the wall drywall, and the builders insulate and rewire in open framing.

The goal

The goal is open wall framing, so the studio is built without positive compound left on the studs.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the walls and the ceiling.
  2. Before work The contractor files the district notice online and the owners empty the garage.
  3. Days one to three The garage is sealed and the wall drywall is removed wet and bagged.
  4. Last An independent consultant tests the air, then the builders start.

Planning right

  • Move storage and the workbench out of the garage.
  • Keep the ceiling for the builders, since it tested clear.
  • Hold the insulation delivery until the air results.
  • Keep the lab report with the conversion plans.

Get a free quoteMore about drywall, joint compound and plaster removal

Whole-house survey filed with the papers from an earlier kitchen job

Example project

Home
1960s house in Buena Park where the kitchen ceiling texture was removed last year
Original request
Plan the bathrooms next and keep one record of what is in the house
Testing
A whole-house survey by a Cal/OSHA-certified asbestos consultant, about 16 samples from every room except the finished kitchen
Found
Asbestos in the hall ceiling texture and the bathroom floor mastic
Clear
The bedroom ceilings and the wall compound
Timeline
Samples, then lab results, then a written report
Estimated testing cost
$1,000

Scope of work

A visit by the consultant, about 16 samples, a lab result for each and a written report with the sample spots marked. Removing anything the survey finds is priced separately.

Project overview

In this example, a family in Buena Park finished a kitchen job last year, with the survey, the district notice and the waste manifest from that work in a folder. Now they are planning the bathrooms and order a survey of the rest of the house.

The report lists what was sampled in each room and where, with the hall ceiling and the bathroom mastic positive. It goes into the same folder, so the house has one set of records.

The goal

The goal is one folder that shows what was sampled, what came out and where it went.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room outside the new kitchen.
  2. Results The lab reports each sample, and the report marks every spot.
  3. Next The folder gets the report beside the notice and the manifest from the kitchen.
  4. Then The bathroom plans are priced with the positive materials in mind.

Planning right

  • Keep the paper copy and a scan of the report.
  • Please do not take samples yourself, the consultant knows where to cut.
  • Give the report to any contractor who bids the bathrooms.
  • Add each new job’s notice and manifest to the same folder.

Get a free quoteMore about asbestos testing and surveys

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 255-6750

Call (657) 255-6750